×

Warning

JUser: :_load: Unable to load user with ID: 135

Future Projects Geared Towards Vision 2030

Construction of a training block that houses in one roof  various departmental laboratories such as Training kitchen with a capacity of handling 50 students in a single training session, this will comprise individual training kitchen (50 working station fully equipped, demonstration kitchen with sitting capacity of 50 persons, fully equipped Test Kitchenette for research and development with a space for at least 10 person, walk in freezer and food stores for both dry and cold food) , Housekeeping Laboratory (3 bed roomed presidential suite with a board room, executive suite, deluxe rooms, demonstration theater with a capacity of 100 students, offices for lectures and a store for linen and equipment. While other mega project geared towards bridging the gap between skilled labor force in the hospitality and tourism industry include the upcoming Ronald Ngala Utalii College in Kilifi County. This project is meant to ease pressure on the existing facility at Kenya Utalii college. The newly constructed Ronald Ngala Utalii College is expected to have its first intake of 1,500 students towards the end of next year. Tourism Principal Secretary Fatuma Hirsi Mohammed said that construction of the first phase of the project is nearing completion

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.